The Final Step Before Handoff
Construction creates a very specific, stubborn type of mess. Standard janitorial services often just push fine drywall dust around, leaving a cloudy film on your newly installed finishes.
Our post-construction protocol focuses on heavy extraction first, followed by meticulous detailing of millwork, glass, and hard floors. We respect your high-end materials and know exactly what to use (and what to avoid) on fresh surfaces.
- HEPA air filtration & fine particulate extraction.
- Safe removal of overspray, adhesives & stickers.
- Multi-phase scheduling (Rough, Final, Fluff).

"You handle the punch list. We'll handle the dust."
Our Phased Cleaning Approach
We adapt to your construction timeline, offering flexibility as trades finish up.
Rough Clean
Performed after framing, plumbing, and electrical. We remove bulk debris to create a safer environment for finishing trades.
- Sweeping and prep of sub-floors
- Removal of large debris and leftover materials
- Removing stickers from windows & fixtures
Final Deep Clean
The intensive, white-glove pass. We extract all fine dust from every surface, track, and crevice.
- HEPA vacuuming of carpets, corners, and edges
- Wiping down millwork, cabinetry, and shelving
- Detailed sanitization of new restrooms & kitchens
- Interior window detailing and track cleaning
Fluff Clean
A rapid touch-up done days before move-in or the grand opening to remove newly settled dust.
- Wiping down flat surfaces and counters
- Re-mopping and final vacuuming
- Smudge removal from glass and mirrors